Sintered Stainless Steel Sparger Elements for Direct Steam Injection
Porous metal steam-injection bodies for approved liquid-heating vessels. Specify steam mass flow, liquid conditions, immersion and metal interfaces.
Porous Steam-Injection Body Inside the Liquid Vessel
The component is a powder-sintered porous metal body introducing steam into a purchaser-designed liquid-heating arrangement. It is separate from a steam filtration cartridge, perforated sparger tube and the complete heater. Supply covers the porous body and agreed metal fitting only.
Explore the main powder-sintered metal filters showcase for related metal mesh constructions.
Metal-only supply covers the component body and metal fittings expressly agreed in the quotation. Seals, gaskets and complete equipment are separate.
Steam Mass Flow and Thermal Cycle
State steam condition and mass flow, pressure and temperature, liquid composition, temperature range and liquid head. Include startup, shutdown and transient loads. Heating rate, condensate mixing and system behaviour require complete-process approval; no claim of eliminating steam hammer follows from a porous label.
Specify the Complete Component
Provide porous envelope, active length, wall, closure and steam connection. Show immersed position, support and withdrawal clearance. Define porous-grade or steam-passage acceptance. Related threaded bodies do not establish the complete heating-system geometry or a ready-rated steam injector.
Include the component revision, mating-interface drawing and the required exposed flow area. Agree the joints, support relationship and any purchaser-provided fitting sample before fabrication.
Information for a Comparable Quotation
| Requirement | Details to provide |
|---|---|
| Element | Porous body, closure and steam fitting |
| Steam | State, mass flow, temperature and pressure |
| Liquid | Composition, head and heating cycle |
| Approval | Steam passage, thermal loads and process trial |
Connection and Full Heating-System Acceptance
Agree fitting, body and steam-passage tests at specified conditions. Review thermal cycling, cleaning exposure and installed loading with the equipment owner. Target heating and system acceptance remain independent of metal-part inspection.
Use the intended mating assembly and purchaser-approved test plan. Agree dimensional inspection and operating acceptance separately; a related construction photograph cannot replace these checks.
Cleaning, Inspection and Repeat Supply
Specify the cleaning method, chemicals, temperature and permitted mechanical handling. Inspect the mesh, edges, joints and supports after cleaning and agree when the component should be rejected or replaced.
For repeat orders, use the accepted component drawing and material specification with the same inspection requirements. Identify changes in fluid, particles, loading or installation before reusing a previous specification.
Product Enquiry FAQ
Send the component and holder drawings, metal and mesh requirements, operating conditions, quantity and acceptance criteria. Unspecified dimensions or duties can be marked for review.
Its specified role is steam introduction into liquid. A steam solids filter is a separate upstream component with its own filtration requirement.
No. This enquiry covers the agreed metal component. Sealing parts, housings and complete equipment are separate.
They show related component or material construction from the existing library. The supplied item follows the agreed drawing and sample acceptance; the images are not an installed-service case study.
Send Your Component and Mating Drawings
Describe the installation, material, mesh requirement and quantity. Maidong can review the requested metal component for fabrication and quotation.